PREdistribuce connection requirements (MM 501), effective 1 January 2025

The distribution company PRE has issued new connection requirements, specifically a new corporate standard, MM 501, which sets out the technical connection requirements for consumption points.
The latest changes to PRE requirements are once again extensive and mainly concern electricity sharing, installation switches and indirect metering:
- At the beginning of MM 501, section A.1, a table showing when the connection requirements apply has been added. It clearly specifies which provisions must be followed for various types of work at consumption points.
- Chapter 1 now defines direct metering, semi-indirect metering and indirect metering. The requirements now distinguish between semi-indirect and indirect metering. The abbreviation MZ is defined for metering equipment; throughout the document, “electricity meter” has been replaced by “metering equipment”.
- In chapter General provisions, section 2, new clause (11) covers connecting a new outgoing feeder to a section cabinet. New clause (14) requires the location and connection method for billing metering equipment at medium- and high-voltage levels to be agreed in advance with an authorised PDS representative.
- In chapter 3, Location of metering equipment, clause (7) no longer contains a table of minimum dimensions for meters and ripple-control receivers (HDO). The required dimensions are now specified in text for metering equipment generally, without distinguishing between three-phase meters, single-phase meters and HDO. The cross-shaped mounting space must therefore always be at least 200 × 400 × 160 mm (width × height × depth).
- Clause (13) now specifies the HDO circuit breaker: maximum 6 A, type B, with a short-circuit rating of 10 kA.
- A major new requirement in clause (16) is a free cross-shaped position for a communications device in new enclosures (new connections or enclosure replacements). This position is recommended for metering up to five consumption points and required for enclosures serving six or more. The communications device must be supplied through a 3 × 6 A, type B, 10 kA circuit breaker. The clause also adds other requirements for preparing the communications-device location.
- Another major new requirement appears in clause (17): newly established or reconstructed direct-metered consumption points must have a disconnecting device on the outgoing/metered line, located outside the unmetered section. This is the so-called installation switch, previously required only for generating facilities.
- Chapter 7, Design of electricity meter boards (enclosures), clause (3), now specifies enclosure ingress protection. Indoor enclosures require IP2XC, outdoor enclosures IP43, and enclosures outdoors beside a road must now meet IP44. See our guide to enclosure IP protection.
- New clause (13) requires the customer’s cooperation in installing an external antenna where mobile signal is insufficient for remote meter reading.
- In chapter 10, Semi-indirect metering in networks up to 1 kV, clause (7) clarifies the required current-transformer orientation: terminal P1/(K) faces the distribution network.
- Clause (21) of the same chapter now specifies an auxiliary control relay for semi-indirect and indirect metering to control blocked loads.
- Chapter 11, Connection of generating facilities operating in parallel with the distribution system, clause (1), paragraphs e) and f), adds requirements for enclosure design related to generator blocking, including a second cross-shaped mounting position for generating facilities.
- Chapter 12, renamed Conditions for changing from non-interval to interval metering (with remote communication), which covers electricity sharing, has been substantially simplified. Sharing is no longer limited to a single apartment building. The meter must still not be covered by a removable cover panel.
- Chapter 14, on electric vehicle connections, has also been simplified.
- Chapter 21, which describes remote meter-reading options, has been partially revised.
...and other minor changes.
Version 16 of the new connection requirements is effective from 1 January 2025.
The PREdistribuce connection requirements can be downloaded here: PREdistribuce corporate standards
(Document: MM 501 Technical connection requirements, Part A — Commercial metering)

We are still expecting changes to ČEZ Distribuce’s connection requirements, so follow our website or subscribe to our news. Simply enter your email in the “Stay up to date” box below.